Free planning tools · Fleet documentation · Supplier matchingDownload free checklist ↓
SELF-SERVICE CARGO SECUREMENT PLANNING

Plan the load.
Document the check.

Build a practical tie-down worksheet, download a driver-ready checklist, and turn equipment requirements into a supplier-ready request—without searching a giant catalog.

FREE No account requiredTXT Downloadable planSAFE Planning aid only
WORKFLOW / SELF-SERVICEREADY
01PLANWeight · length · WLL
02CHECKInspection · documentation
03SOURCESupplier-ready requirements
EXAMPLE ESTIMATED MINIMUM4 tie-downs

9,200 LB required aggregate WLL

Open plan builder
BUILT FOROWNER-OPERATORS·SMALL FLEETS·SAFETY TEAMS·SUPPLIERS
01

ONE WORKFLOW

Useful before anyone
needs a sales call.

Start free, keep the worksheet, and only request a supplier or fleet pilot when the requirement is clear.

FREE

Plan Builder

Estimate tie-down count, compare WLL, capture application notes, and download a planning worksheet.

Build a plan →
$49 / VERSION 1.0

Fleet Toolkit

Nine printable forms plus a seven-sheet Excel workbook for planning, inspections, inventory, replacement, and RFQs.

Reserve launch price →
FROM $19 / MONTH

Fleet Log Pilot

Mobile inspections, photo-ready records, equipment replacement reminders, and manager reporting.

NO BUYER FEE

Supplier Match

Send a structured requirement to a suitable supplier instead of repeating the same specification by phone.

FREE PLAN BUILDER

Turn load details
into a working plan.

Use the general WLL and article-length checks as a starting point, then review application-specific rules before transport.

½Aggregate WLL generally must equal at least half the cargo weight.
10'Article length can change the minimum number of tie-downs required.

Planning aid only—not a compliance certification, engineering determination, or substitute for current regulations, commodity-specific requirements, equipment inspection, manufacturer instructions, and company policy.

SECUREMENT WORKSHEETUS / IMPERIAL
Attachment method
ESTIMATED MINIMUM4 tie-downs

Required aggregate WLL9,200 LB

Planned aggregate WLL21,600 LB

Weight / length check2 / 4

Equipment starting pointReview rated transport chain and binder assemblies or heavy-duty direct tie-downs, with anchor points and WLL matched to the application.

Application noteApply the general securement rules and verify that the cargo is prevented from shifting in every direction.

DOWNLOADABLE FLEET TOOLS

Documentation your
drivers can actually use.

Start with the free files today, then move to the finished Fleet Toolkit for printable inspections, formula-driven planning, inventory, replacement, and supplier RFQs.

VERSION 1.0 READY

Fleet Cargo Securement Toolkit

$49one-time internal-use license
  • 10-page printable PDF toolkit
  • Formula-driven load planning workbook
  • Inspection and reinspection logs
  • Inventory and replacement tracking
  • Damage, training, RFQ, and manager forms
  • Protected digital delivery when checkout is active
Reserve $49 launch access Preview every included workflow →Checkout connection is pending; launch-access requests do not collect payment.
03

AUTOMATED HANDOFF

A cleaner request
for the right supplier.

The plan captures the technical starting point. The match form adds location, fleet size, timeline, and the commercial requirement.

01

Build

Enter the load, vehicle, cargo, WLL, and attachment details.

02

Structure

Add ZIP code, fleet size, quantities, and sourcing timeline.

03

Match

The saved requirement is ready for routing to an appropriate supplier.

Ratchet strapsWinch strapsTransport chainBindersE-trackVehicle tie-downsEdge protectionCustom assemblies
SAVE YOUR INTEREST

Choose the next
step—not a sales call.

Requests are saved securely for toolkit early access, Fleet Log pilot invitations, or supplier matching.

SELECTED PATHSupplier match request

No payment is collected. See our Privacy Policy.

04

STRAIGHT ANSWERS

What this platform
does—and does not do.

Clear boundaries keep the free tools useful without presenting a worksheet as a compliance certification.

Is the plan builder a compliance determination?

No. It is a general planning worksheet. Users must verify current regulations, cargo-specific rules, equipment condition, manufacturer instructions, and company policy.

What is included in the free download?

The free starter files include a pre-trip securement checklist and a tie-down equipment inventory template in CSV format.

Is the Fleet Toolkit finished?

Yes. Version 1.0 includes a 10-page printable PDF, seven-sheet Excel workbook, readme, and internal-use license. The checkout account still needs to be connected; the current request form reserves the $49 launch price without taking payment.

Does supplier matching cost the buyer?

The planned matching path does not charge the buyer. A request is only routed after the user chooses supplier matching and provides the relevant details.